Home
Download PDF
Order CD-ROM
Order in Print
Home
>
Cold Research and Engineering Laboratory Reports
>
> Figure 18. Trafficking the absorbent test section.
Absorbent demonstration
Figure 22. Test section after one pass with a CUCV.
TR00-08
Page Navigation
10
11
12
13
14
15
16
17
18
19
20
Figure
17.
Adding
water to
the
absorbent
test
section
at
Ethan
Allen
Firing
Range,
Vermont.
Figure
18.
Trafficking
the
absorbent
test
section.
Figure
19.
Wheel
ruts
after
one
pass.
13
To
Contents