Assessment of Sampling Error Associated with Collection and Analysis of Soil Samples at Explosives-Contaminated SitesEXPERIMENTAL - SR96_150008Soil sampling procedureOn-site soil processingFigure 3. Soil sample preparation for analysisColorimetric on-site analysis for TNT and 2,4-DNTSoil processing for laboratory analysisStatistical analyses - SR96_150014Table 1. Results from sampling location 1, Monite siteTable 1. Continued - SR96_150016Figure 4. Log-transformed TNT concentrations from sampling location 1-linear model with interceptTable 2. Results from sampling location 2, Monite siteTable 2. Continued - SR96_150019Figure 5. Log-transformed DNT concentrations from sampling location 2--linear model with interceptTable 3. Results from sampling location 3, Monite site.Table 3. Continued - SR96_150022Hawthorne AAPSampling location 5Table 5. Results from sampling location 5, Hawthorne AAP site.Sampling location 6Table 6. Results from sampling location 6, Hawthorne AAP siteTable 6. ContinuedVolunteer AAPTable 7. Results from sampling location 7, Volunteer AAP siteTable 7. Continued - SR96_150031Table 7. Continued - SR96_150032Table 7. Continued - SR96_150033Table 8. Results from sampling location 8, Volunteer AAP siteTable 8. Continued - SR96_150035Table 9. Results from sampling location 9, Volunteer AAP siteTable 9. ContinuedSUMMARY OF RESULTSFigure 10. Untransformed TNT concentrations for composites from sampling ocations 1, 3, 4, 5, 8, 9Table 10. Fractionation of total error into analytical and sampling componentsTable 12. Comparison of results for discrete and composite soil analysisAPPLICATION OF RESULTSLITERATURE CITED - SR96_150043LITERATURE CITED-continue - SR96_150044Report Documentation Page - SR96_150045SR96_15