MESLs
11
Hoyt's Hill
Rivers
Fort Drum
Runway
Military Installation
Paved Roads
Tank Trails
26
Gravel Stockpile
Old
Wash Rack
1 kilometer
Cantonment
Area
1 mile
3A
Figure 2. Test-site locations at Fort Drum, New York.
MESL 1
MESL 2
Control
5.2 m
(17 ft)
Approx. 152 m
34.1 m
93.0 m
24.1 m
23.2 m
(500 ft)
(112 ft)
(305 ft)
(79 ft)
(76 ft)
Poagland Road
Lime-Treated
Untreated
Untreated
Encapsulated
Encapsulated
Soil
Soil
Soil
C
D
A
B
Native Material
C
D
A
B
A-A
B-B
C-C
D-D
150-mm (6-in.) Gravel
Geotextile
7.9 m
3.4 m
1.2 m
3.4 m
(26 ft)
(11 ft)
(4 ft)
(11 ft)
RUFCO
DURA-SKRIM
RUFCO
RUFCO
2010B
12 BBR
2010B
2010B
RUFCO
Ply X-150
Ply X-150
Ply X-150
0.6 m
610B
(2 ft)
Figure 3. Construction details of the MESLs.
6