Home
Download PDF
Order CD-ROM
Order in Print
Home
>
Cold Research and Engineering Laboratory Reports
>
> SR97_33
Results of Stabilized Waste Material Testing for the Raymark Superfund Site
Figure 1. Raymark Superfund site map
Clegg impact hammer
Dual-mass dynamic cone penetrometer (DCP)
TEMPERATURE DATA AND ANALYSIS
Figure 9. Thermocouple configuration
Figure 11. Estimated frost depth
Figure 12. Variability of unconfined compressive strength for December and March Clegg data
FIELD TESTING DATA ANALYSIS
CONCLUSIONS - SR97_330016
LITERATURE CITED - SR97_330017
APPENDIX A: THERMOCOUPLE TEMPERATURE DATA
Figure A4. Site 20, string B
Figure A6. Site 30, string B
Figure A8. Site 40, string B
APPENDIX B: CLEGG IMPACT HAMMER DATA
CLEGG HAMMER TESTS MARCH Site 1
CLEGG HAMMER TESTS DECEMBER Site 2
CLEGG HAMMER TESTS MARCH Site 2
CLEGG HAMMER TESTS DECEMBER Site 3
CLEGG HAMMER TESTS MARCH Site 3
APPENDIX C: DCP DATA
Site 1, 18 inches (Dec)
Site 3,12 inches (Dec)
Report Documentation Page - SR97_330032
SR97_33