Home
Download PDF
Order CD-ROM
Order in Print
Home
>
Cold Research and Engineering Laboratory Reports
>
> CR99_10
Enhanced Natural Remediation of White-Phosphorus-Contaminated Wetlands through Controlled Pond Draining
Extent of contamination of Eagle River Flats
Persistence of white phosphorus in a wetland
Physical processes of Eagle River Flats
Treatment methodologies
Figure 4. Remote dredge operation in Pond 146
Pond draining: ditching
CONTROLLED POND DRAINING FEASIBILITY STUDY
Initial study deployment of a pump system (1997)-continue
Monitoring methods
Figure 9. Map of composite sampling transects in Pond 109 (BT) and 183 (Area C)
Sublimation/oxidation conditions - CR99_100018
Feasibility study of large-scale deployment (1998)
Results - CR99_100020
Full-scale deployment--1998
Sublimation/oxidation conditions - CR99_100022
Figure 13. Area C moisture probe sensor output (1997-98)
Figure 14. Groundwater elevation and surface moisture content in Area C (1998)
Composite sampling
Discrete sampling in Area C
CONCLUSIONS - CR99_100027
RECOMMENDATIONS - CR99_100028
LITERATURE CITED - CR99_100029
LITERATURE CITED-continue - CR99_100030
Report Documentation Page - CR99_100031
CR99_10