Form Approved
REPORT DOCUMENTATION PAGE
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the
data needed, and completing and reviewing this collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing
this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302.
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. REPORT DATE (DD-MM-YY)
2. REPORT TYPE
3. DATES COVERED (From - To)
August 2000
Technical Report
4. TITLE AND SUBTITLE
5a. CONTRACT NUMBER
5b. GRANT NUMBER
Cazenovia Creek Ice-Control Structure
5c. PROGRAM ELEMENT NUMBER
6. AUTHOR(S)
5d. PROJECT NUMBER
James H. Lever, Gordon Gooch, and Steven F. Daly
5e. TASK NUMBER
5f. WORK UNIT NUMBER
7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES)
8. PERFORMING ORGANIZATION REPORT
NUMBER
U.S. Army Engineer Research and Development Center
Cold Regions Research and Engineering Laboratory
72 Lyme Road
ERDC/CRREL TR-00-14
Hanover, New Hampshire 03755-1290
9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES)
10. SPONSOR / MONITOR'S ACRONYM(S)
U.S. Army Engineer District, Buffalo
11. SPONSOR / MONITOR'S REPORT
1776 Niagara Street
NUMBER(S)
Buffalo, New York 14207
12. DISTRIBUTION / AVAILABILITY STATEMENT
Approved for public release; distribution is unlimited.
Available from NTIS, Springfield, Virginia 22161.
13. SUPPLEMENTARY NOTES
14. ABSTRACT
Cazenovia Creek, in Western New York, is the largest tributary of the Buffalo River. Breakup ice jams form along the lower basin
nearly every year during mid-winter or spring thaws, and ice-jam flooding occurs in the City of Buffalo and the Town of West Seneca
about every 23 years. This report describes physical model tests and design recommendations for a new ice-control structure (ICS) for
Cazenovia Creek. The recommended structure consists of nine 10-ft-tall 5-ft-diameter cylindrical piers spaced across the main channel,
and it uses the adjoining treed floodplain as a natural bypass channel. Also described are results from a numerical icehydraulic model to
determine the extent of flooding induced upstream of the new ICS. Although few structures are affected, the ice jam held by the ICS will
cause minor flooding of properties abutting the creek. However, the stream-wise extent of this flooding will decrease during an event as
melting and washouts reduce the volume of ice in the jam. The structure balances the need to protect downstream areas from natural ice-
jam flooding and the need to minimize upstream flooding induced by the retained ice.
15. SUBJECT TERMS
Buffalo River
Ice
Ice jams
Cazenovia Creek
Ice control
16. SECURITY CLASSIFICATION OF:
17. LIMITATION OF
18. NUMBER
19a. NAME OF RESPONSIBLE PERSON
OF ABSTRACT
OF PAGES
a. REPORT
b. ABSTRACT
c. THIS PAGE
19b. TELEPHONE NUMBER (include area code)
U
U
U
U
27
Standard Form 298 (Rev. 8-98)
]PrescrCbed by TS SI Std. 239.18
TO i ONTENAN