Home
Download PDF
Order CD-ROM
Order in Print
Home
>
Cold Research and Engineering Laboratory Reports
>
> Figure 9. Drainage times for 4.5- to 7.5-m weirs
Supernatant filtering
Site characterization - SR96_220019
SR96_22
Page Navigation
7
8
9
10
11
12
13
14
15
16
17
14
12
10
t(L)
(hrs)
8
6
4
2
4
6
8
10
L,
Weir
Length
(m)
Figure
8.
Confirmation
of integral
relationship.
2.4
2.2
2.0
1.8
1.6
1.4
4.5
5.5
6.5
7.5
L,
Weir
Length
(m)
Figure
9.
Drainage
times
for
4.5-
to
7.5-m
weirs.
12