Form Approved
REPORT DOCUMENTATION PAGE
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the
data needed, and completing and reviewing this collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing
this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302.
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid
OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. REPORT DATE (DD-MM-YY)
2. REPORT TYPE
3. DATES COVERED (From - To)
July 2000
Technical Report
4. TITLE AND SUBTITLE
5a. CONTRACT NUMBER
5b. GRANT NUMBER
Expedient MESL Construction in Cold Weather
5c. PROGRAM ELEMENT NUMBER
6. AUTHOR(S)
5d. PROJECT NUMBER
Jeffrey A. Stark, Rosa T. Affleck, and Sherri A. Orchino
5e. TASK NUMBER
5f. WORK UNIT NUMBER
7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES)
8. PERFORMING ORGANIZATION REPORT
NUMBER
U.S. Army Engineer Research and Development Center
Cold Regions Research and Engineering Laboratory
72 Lyme Road
ERDC/CRREL TR- 00-8
Hanover, New Hampshire 03755-1290
9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES)
10. SPONSOR / MONITOR'S ACRONYM(S)
Office of the Chief of Engineers
11. SPONSOR / MONITOR'S REPORT
Washington, D.C. 20314-1000
NUMBER(S)
12. DISTRIBUTION / AVAILABILITY STATEMENT
Approved for public release; distribution is unlimited.
Available from NTIS, Springfield, Virginia 22161.
13. SUPPLEMENTARY NOTES
14. ABSTRACT
A new method of constructing membrane-encapsulated soil layers (MESLs) using plastic membranes, geotextiles, tapes for
sealing the membranes, and absorbents for drying the soil was demonstrated. These materials would allow construction of a
MESL in cold weather. The demonstration took place at Fort Drum, New York, and at Ethan Allen Firing Range, Jericho,
Vermont. Three layers of a 271-g/m2 (8-oz/yd2) geotextile successfully protected the membrane during a puncture test, and
absorbents successfully caused the soil to act drier to increase vehicle trafficability. However, the geotextile is still too weak to
be used in a MESL. Although the individual components performed well, the construction process is too exacting to be
performed successfully and is not recommended for Army engineers.
15. SUBJECT TERMS
Thaw weakening
MESL
Absorbent
Frost-susceptible soils
Moisture-susceptible soils
Expedient road construction Membrane-encapsulated soil layer
16. SECURITY CLASSIFICATION OF:
17. LIMITATION OF
18. NUMBER
19a. NAME OF RESPONSIBLE PERSON
OF ABSTRACT
OF PAGES
a. REPORT
b. ABSTRACT
c. THIS PAGE
19b. TELEPHONE NUMBER (include area code)
U
U
U
U
32
Standard Form 298 (Rev. 8-98)
]PresToibed by ANSI Std. 239.18