temperatures and by these times, even ad-
400
mixture-free concrete may have been able
to set and become resistant to freezing.
300
The test showed that a plastic sheet was
capable of providing more than just protec-
tion against moisture loss. Figures 13 and
200
14 show that the concrete under the plastic
sheet was actually warmer than the con-
100
crete inside the unheated shelter, at least on
sunny days. The sheet-covered concrete was
5 to 10C warmer during the day on all
0
5
0
5
10
20
days but 21 March, which was cloudy. On
Lowest Working Temperature (C)
that day, the two concrete temperatures
were nearly identical. During nighttime, the
Figure 16. Possible extension of construction season with vari-
opposite occurred: the concrete inside the
ous low-temperature limits (Horrigan 1995, unpublished).
unheated shelter was up to 1.5C warmer.
These observations can be explained by the
effect of the large volume of air within the shelter.
peratures can cause significant strength loss.
The plastic sheet, having essentially no air to heat
The potential effect on the length of the con-
up and cool off, allowed the concrete to heat and
struction season of being able to place and keep
concrete at 5C (23F) instead of at the current
cool faster than could the concrete inside the shel-
limit of 5C (41F) can be determined by looking
ter. The six-day temperature of the concrete un-
der the plastic sheet averaged 2.4C (36.3F) com-
at weather records. The number of days that the
pared to only 0.9C (33F) for the concrete in the
maximum air temperature in northern Michigan
unheated shelter. A blanket of insulation would
(at the Soo Locks) exceeded various low tempera-
undoubtedly have performed even more effec-
tures is shown in Figure 16. As can be seen, push-
ing the temperature envelope to 5C (23F) in-
tively.
Of special interest in these tests was how the
creases the length of the construction season by
work would progress in cold weather. The work-
nearly 80 days. More working days become avail-
ers at the Soo Locks stated that working outdoors
able at lower temperatures, to the point that con-
was much preferred to working in a confining,
creting is a year-round proposition without the
though heated, enclosure. It was much easier to
need for heat. The climate at the Soo is similar to
place and finish the concrete where there was
that of the coldest areas in the contiguous United
freedom of movement. The consensus was that
States.
outdoor concreting was practical down to 20C
(4F), possibly lower, provided a heated shelter
was available to warm up in periodically. At the
CONCLUSIONS
Soo, the workers worked outdoors in windy
10C (14F) weather for two-hour intervals. The
The results from investigating Pozzutec 20 and
finishing operation required no special tools, skills,
developing a new prototype admixture indicate
or precautions. The antifreeze concrete finished
the following:
in the same manner as normal concrete. Ice did
1. Pozzutec 20 accelerates and enhances the
not build up on the cold metal tools as suspected.
strength gain of concrete. When cured at room
Concreting in winter costs more than during
temperature, Pozzutec 20, used at its maximum
the rest of the year. The extra costs in this test
permissible dosage of 60 mL/kg (90 fl oz/cwt),
were 113 percent for the enclosure, and up to 43
improved the seven-day strength of concrete by
percent for the admixture. Costs associated with
nearly 20%. A similar result was produced when
antifreeze admixtures were more than offset by
the concrete was tested after 56 days of room-
savings on protection requirements.
temperature curing.
From a strength development standpoint, the
2. Compared to the more-than 35 trial admix-
antifreeze concrete was equal to or better than the
tures tested, Pozzutec 20 provided the fastest set-
concrete placed inside a heated enclosure. Dry
ting concrete. In one test conducted in mortar,
heat can create problems. In fact, if the tempera-
Pozzutec 20 shortened the initial set time of con-
ture of concrete is not closely regulated, high tem-
crete from 4 1/6 hours to 2 5/6 hours. The best
25