Figures
Figure 1. Experimental setup: a) CRREL soil-erosion simulator looking upstream with FT bin on right
and C bin on left, and b) discharge receiving reservoirs (white) below the soil bins. Note the
flow inlet, imposed rectangular rill, downstream weir, and groundwater wells in each bin, and
discharge/sediment sample collection.
16