EAGLE RIVER FLATS FY 00
36
APPENDIX III-1-B: RECOMMENDATIONS AND STATUS OF DEVEL-
OPMENT WORK AND EQUIPMENT MODIFICATIONS FOR EAGLE
RIVER FLATS REMEDIATION PROJECT
Continual refinement of the equipment and procedures at Eagle River Flats is
one of the dividends of having so many talented people involved. Over the last
couple of years, the major impediments to efficient and reliable operation of the
pump systems have been addressed and resolved. We are at the point where low-
cost refinements to the equipment and optimization of the operational logistics
will improve the overall system the greatest. Following the completion of the 2000
season operations, a meeting was held at CRREL to discuss possible improvements
for the upcoming year. The following table describes these proposals and their
current status.
Table III-1-B1. Propsed equipment modifications and development work for 2001.
Description
Class*
Proposed Solution
Status
Attaching hose to pump
D
Better marking of center of sump, marking the location
Field mod
of discharge end of first section of hose,
Control cable deployment
D
Make small reel cradles to hold reel vertical;
On hold
need one for each genset
Float switch extensions
E
Order switches with longer pigtails to eliminate the
Ordered
connectors leak
need of an extension cable
Power pigtails on pumps
E
Hardware ordered to enable quickly tying off the pump
Ordered
need tieoffs
power pigtails for transport
Securing loose equipment
L
Make up boxes that can be tied down to gensets that
On hold
on gensets
will hold or store equipment
Discharge line orientation
D
Mark and flag bell end of one section of line prior to airlift;
Field mod
attach rope to control load
Use of Guard chain slings
D
Attach swivel snap hooks to chain to expedite attachment
Ordered
on heavy equipment
operation during lifts
Hose storage on EOD Pad
L
Construction of a 40' by 8' lean-to on the EOD Pad
On hold
Ground-to-air coordination
D
Better marking of landing spot, better planning, and better
In process
during lifts
visibility of guides
Missing connectors on
E
Order new connectors and repair them next season
On hold
control cables
Shielding controls from sun
E
Add velcro-backed sun shields to visual access windows
Ordered
on control cabinets
Mounts for webcam solar panels E
Make flexible mounts for solar panels to optimize efficiency
Ordered
Reduce off-line power con-
E
Development work is underway; components have been
Ordered
sumption of remote equipment
identified and ordered to optimize electronics
Improve camera output
E
Looking at lenses and filters
On hold
Protection of modems at
E
Replace commercial modems with industrial modems
Ordered
Rt. Bravo station
for added protection
Classes: D = Deployment / Retrograde, E = Equipment mods, L = General logistics