SURF1w
SURF3w
SURF5w
SURF2w
SURF4w
Figure 27. The linkage between GROFF1, GROFF2,
GROFF3, GROFF4, GROFF5, and SRFRNF. SURF1w,
SURF2w, SURF3w, SURF4w, and SURF5w from GROFF1,
GROFF2, GROFF3, GROFF4, and GROFF5 were ghosted,
placed within SRFRNF and linked to INFLOW_5 with con-
nectors. For simplification, only those objects that are used
to link the sectors are shown.
INFLOW 5
To simulate the percolation of water from the bottom soil layer (BTM_LYR) to subsurface storage,
GROFF2 was linked to SBS_STOR_&_FLOW_1 and GROFF4 was linked to SBS_STOR_&
_FLOW_2. To simulate the percolation of water from from the bottom soil layer to groundwater
storage, GROFF3 was linked to GDWTR_&_BASFLW_1 and GROFF5 was linked to GDWTR_&
_BASFLW_2. No ghosts were used to link these sectors. Instead, these sectors were connected by
linking the object representing the output from one sector with the object representing the input to
another sector with a connector.
Figure 28 shows the linkage between GROFF2 and SBS_STOR_&_FLOW_1. For simplification,
this figure only includes the objects which which best describe the link between GROFF2 and
SBS_STOR_&_FLOW_1. In addition, GROFF2 appears much larger in the main object model.
Figure 28 shows that "P," the output from GROFF2, is linked to "I," the input to
SBS_STOR_&_FLOW_1 with a connector. The link between GROFF3 and GDWTR_&_
BASFLW_1, GROFF4 and SBS_STOR_&_FLOW_2, GROFF5 and GDWTR_&_BASFLW_2 are
not be shown because they are identical to the link between GROFF2 and SBS_STOR_&_FLOW_1.
To simulate the discharge from the watershed outlet, SRFRNF, SBS_STOR_&_FLOW_1,
SBS_STOR_&_FLOW_2, GDWTR_&_BASFLW_1, and GDWTR_&_BASFLW_2 were linked to
CHNLRTNG. The link between SRFRNF and CHNLRTNG represents the contribution of surface
runoff to discharge. The link between SBS_STOR_&_FLOW_1 and CHNLRTNG represents the
contribution of subsurface flow from zone 2 to discharge. The link between GDWTR_&_BASFLW_1
and CHNLRTNG represents the contribution of baseflow from zone 2 to discharge. The link between
BTM LYR
P
Figure 28. The link between GROFF2 and
SBS_STOR_&_FLOW_1. The link between
GROFF2 and SBS_STOR_&_FLOW_1 represents
the percolation of water in zone two from the bottom
soil layer (BTM_LYR) to surbsurface storage
(SBS_STOR). "P," the output from GROFF2, is
linked to "I," the input to SBS_STOR_&_FLOW_1,
with a connector. The link between GROFF2 and
I
SBS_STOR_&_FLOW_1 is identical to the link
which joins GROFF3 to GDWTR_&_BASFLW_1,
GROFF4 to SBS_STOR_&_FLOW_2, and GROFF5
SBS STOR
to GDWTR_&_BASFLW_2. For simplification, only
those objects which represent the linkage between
GROFF2 and SBS_STOR_&_FLOW_1 are shown.
OUTFLOW II
INFLOW II
40