APPENDIX D: SURVEY DATA FOR DREDGED AREA
AND SAMPLE POINTS
The data in Table D1 were obtained from 30 September to 2 October 1996 as part of the
sampling and evaluation tasks for the dredge project. Water depths are referenced to the
water surface at the time of surveying. Flooding tides (10.1 m max.) occurred from 25 Sep-
tember to 1 October. Surveying was done using a Leitz SET4B electronic total station and a
triple reflective prism mounted on a 1.45-m-tall prism rod.
Table D2 contains survey data for nonperipheral dredged areas. These points were used
to weight the average depth calculations for reporting purposes. They are more representa-
tive of the overall depth of dredging as they are measured away from the edge slumping.
Table D1. Dredged depths at survey point locations.
Avg. depth*
Starting coordinate
Ending coordinate
Transect
Location
(m) (in.)
Easting
Northing
Easting
Northing
Line 1
Clunie Inlet
0.77
30
355,335.18
6,801,299.28
355,303.83
6,801,328.47
Line 2
Clunie Inlet
0.78
31
355,326.43
6,801,306.59
355,316.30
6,801,337.13
Line 3
Clunie Channel
0.75
30
355,301.42
6,801,313.17
355,298.91
6,801,316.19
Line 4
Clunie Channel
0.70
28
355,295.52
6,801,294.76
355,289.53
6,801,297.67
Line 5
Clunie Channel
0.74
29
355,291.54
6,801,279.73
355,285.73
6,801,281.78
Line 6
Clunie Channel
0.71
28
355,289.42
6,801,259.21
355,281.19
6,801,259.50
Line 7
Clunie Channel
0.47
19
355,292.41
6,801,237.20
355,288.83
6,801,236.90
Line 8
Clunie Channel
0.52
20
355,293.19
6,801,219.50
355,291.25
6,801,220.85
Line 9
Canoe Pt. Pond
0.60
24
355,296.45
6,801,203.88
355,291.38
6,801,203.23
Line 10
Canoe Pt. Pond
0.59
23
355,311.11
6,801,190.62
355,291.15
6,801,181.23
Line 11
Canoe Pt. Pond
0.73
29
355,326.26
6,801,177.17
355,295.25
6,801,152.00
Line 12
Canoe Pt. Pond
0.72
28
355,340.86
6,801,167.50
355,335.83
6,801,157.38
Line 13
Canoe Pt. Pond
0.73
29
355,363.18
6,801,155.62
355,361.12
6,801,146.36
Line 14
Ch. to EOD
0.75
30
355,380.38
6,801,144.34
355,379.52
6,801,141.43
Line 15
Ch. to EOD
0.75
30
355,393.18
6,801,137.71
355,392.33
6,801,134.46
Line 16
Ch. to EOD
0.71
28
355,404.67
6,801,131.94
355,403.01
6,801,128.82
Line 17
Ch. to EOD
0.64
25
355,416.88
6,801,122.81
355,415.83
6,801,121.40
Line 18
Ch. to Pond 183
0.52
20
355,279.21
6,801,170.52
355,278.87
6,801,168.46
Line 19
Ch. to Pond 183
0.60
24
355,262.69
6,801,176.53
355,261.66
6,801,174.64
Line 20
Ch. to Pond 183
0.37
15
355,249.83
6,801,181.32
355,250.25
6,801,178.99
Line 21
Ch. to Pond 183
0.41
16
355,238.83
6,801,183.37
355,238.27
6,801,180.45
Line 22
Ch. to Pond 183
0.38
15
355,225.38
6,801,186.64
355,224.33
6,801,184.92
Line 23
Ch. to Pond 183
0.36
14
355,209.22
6,801,192.47
355,208.47
6,801,190.57
Line 24
Ch. to Pond 183
0.42
17
355,194.39
6,801,197.80
355,193.80
6,801,195.94
Line 25
Ch. to Pond 183
0.41
16
355,181.21
6,801,202.92
355,180.76
6,801,200.84
Line 26
Ch. to Pond 183
0.50
20
355,171.80
6,801,206.30
355,171.26
6,801,204.29
Line 27
Ch. to Pond 183
0.61
24
355,160.24
6,801,207.34
355,160.70
6,801,209.40
* Based on a water surface elevation of 4.83 m at the time of survey on 2 Oct 96.
Previous flooding high tide night of 30 September.
29