• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print

Home > Cold Research and Engineering Laboratory Reports > > CR98_05

Dredging as Remediation for White Phosphorus Contamination at Eagle River Flats, Alaska
BACKGROUND - CR98_050008
Figure 3. Dredging layout
INITIAL DEPLOYMENTS
Table 1. Pump performance test
Figure 6. Slurry pump eye clogging
Auger drive motor
RESULTS OF 1995 WORK
CONTRACT DEPLOYMENT
RESULTS OF 1996 WORK
Salinity measurements
Basin monitoring instrumentation
Dredge monitoring
Figure 13. Aerial view of dredged area
Attenuation study
Organic contents
SUMMARY - CR98_050023
RECOMMENDATIONS - CR98_050024
LITERATURE CITED - CR98_050025
LITERATURE CITED-continue - CR98_050026
APPENDIX A: ANALYSIS OF DREDGE PUMP OPTIONS
Figure A2. Pump curves for 1470-rpm impeller
Table A1. Slurry pump power requirements
Table A2. Final pump performance test results
APPENDIX B: DATA FOR FALLING HEAD PERCOLATION TESTS IN BASIN
APPENDIX C: RESULTS OF ANALYSIS OF SAMPLES FOR WHITE PHOSPHORUS
APPENDIX D: SURVEY DATA FOR DREDGED AREA AND SAMPLE POINTS
Table D2. Dredged depths at other locations
APPENDIX E: BASIN SEDIMENT CHARACTERIZATION DATA AND ANALYSIS
Table E2. Organic carbon content analyses
Report Documentation Page - CR98_050039
CR98_05






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.