Home
Download PDF
Order CD-ROM
Order in Print
Home
>
Cold Research and Engineering Laboratory Reports
>
> Figure 9. Scatter plots of band 2 vs. band 3. Red indicates intact roof, and green is roof under construction at (a) 8-in. GSD and (b) 2-ft GSD
Sun angle
Leaf on/off and palms
TR02-11
Page Navigation
22
23
24
25
26
27
28
29
30
31
32
20
ERDC/CRREL
TR-02-11
Figure 9.
Scatter
plots
of
band
2
vs.
band
3.
Red
indi-
cates
intact
roof,
and
green
is roof under
construc-
tion
at
(a)
8-in.
GSD
and
(b)
2-ft
GSD.