CONSTRUCTION EVALUATION FORM
Rapid Stabilization of Thawing Soils Project
Ft. McCoy, Wisconsin, 1431 March
Evaluator
Date
Location of Test Section
Type of Test Section
Wooded Road ____
Chunkwood _____ with geosynthetic Y N
Slopes ____
Tire Chunks _____ with geosynthetic Y N
Corners ____
Debris/Slash _____ with geosynthetic Y N
Other
Wooden Mats _____
Terra Mats _____ Tire Side Walls 20 ft
Terra Mats _____ Track Vehicle 10 ft
PVC Pipe Fascine _____
Geosynthetic Composite _____
Equipment Required
Personnel Required
Yes
No
Quantify
D7 Bulldozer
Yes
No
Dump Truck 7 yd
Yes
No
Grader
Yes
No
Loader
Yes
No
Backhoe
Yes
No
Fork Lift
Yes
No
Lowboy Trailer
Yes
No
Started Construction _______________ Ended Construction _______________
Please note any major breaks in construction
Volume of material used (# of truck loads) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
How difficult was construction?
Ways to improve construction?
Methods that worked well?
Comments:
--Figure F9. Construction evaluation form.