Figures
140%
120%
100%
TARGET
80%
60%
ACCESS
40%
ROAD TO
TARGET
SIDE A→
Composite B built by
Composite A built by
20%
←SIDE B
walking 100-200 m
walking 100-200 m
0%
ROAD ALONG THE RANGES, LAKE ↓, FLIGHT PATH ↑, RANGE
Figure 1: Schematic of the Linear Sampling Strategy
0%
BEHIND TARGETS
20%
TARGET
TARGET
TARGET
40%
60%
IN FRONT OF TARGETS
80%
B
A
100%
120%
140%
TOWARDS PRIMEROSE LAKE ↓, FLIGHT PATH↓,
Figure 2: Modified Linear Strategy in Jimmy Lake Range
79
DRDC Valcartier TR 2004-204