and the ensemble forecast model meteorological conditions. The ensemble forecast
model produced a 48-hour forecast. To simplify the analysis we used the SNTHERM-RT
road surface temperatures based on the 18 UTC ensemble forecast. For all hours except
18 UTC we had two road surface temperature forecast values available; one from the
latest forecast and one from the previous forecast.
144